Compliance Tools
CRA Incident Reporting Guide
The 3-stage vulnerability and incident reporting process required by Article 14 of the Cyber Resilience Act — explained in plain language for developers and product teams.
What Starts the Clock?
The reporting obligation is triggered when a manufacturer becomes aware of either:
You discover (or are informed) that a vulnerability in your product is being actively exploited in the wild. This includes vulnerabilities in third-party components you integrate.
Article 14(1)An incident that negatively affects, or is capable of negatively affecting, the product's ability to protect the availability, authenticity, integrity or confidentiality of sensitive or important data or functions; or that has led, or is capable of leading, to the introduction or execution of malicious code.
Article 14(3), (5)Key point: The clock starts when you become aware — not when you confirm or fully analyze the issue. Early notification with incomplete information is expected and required.
The 3-Stage Reporting Timeline
Case deadlines
Cases are saved on this device for the current account and product. No cloud sync, regulatory submission or background alert is performed. Calendar events require import into your calendar. Times are entered locally; calendar-month calculations use UTC.
Could not save. Another tab may have changed this case, or browser storage is unavailable. Keep your input and reload before retrying.
Stage 1: Early Warning
Within 24 hours Article 14(2)(a) / 14(4)(a)This is your first notification. The goal is to alert authorities quickly, even with limited information. Don't wait until you have a complete picture — speed matters more than detail at this stage.
- ● That you have an actively exploited vulnerability or severe incident
- ● Which EU Member States your product is available in (if known)
- ● Whether the incident is suspected to be caused by unlawful or malicious acts (for incidents)
- ● Sensitivity classification — whether you want restricted dissemination
Stage 2: Detailed Notification
Within 72 hours Article 14(2)(b) / 14(4)(b)Now you provide a more complete picture. By this point you should have more details about the vulnerability, its exploitation, and what you're doing about it.
- ● General information about the affected product (name, version, category)
- ● General nature of the exploit and of the vulnerability
- ● Corrective or mitigating measures you have taken
- ● Corrective or mitigating measures users can take
- ● Sensitivity assessment of the notified information
- ● Member States where product is available
Stage 3: Final Report
Final report: 14 days / one month Article 14(2)(c) / 14(4)(c)Notify without undue delay: early warning within 24 hours and notification within 72 hours of awareness. Vulnerability final report: within 14 days after a corrective or mitigating measure is available. Severe incident final report: within one month after the actual incident notification.
- ● A detailed description of the vulnerability, including its severity and impact
- ● Information about any malicious actor that exploited the vulnerability (if available)
- ● Details about the security update or corrective measures made available
Note for severe incidents (Article 14(4)(c)): The final report deadline is 1 month after the Stage 2 notification, and must include: detailed incident description, root cause analysis, and applied and ongoing mitigation measures.
Auto-Generate ENISA Notification Templates
Use this tool to automatically generate all 3 stages of ENISA notification templates based on a CVE and your product information. Perfect for streamlining your reporting process. Prefer a guided, step-by-step version instead? Open the ENISA Reporting Wizard →
Where to Send It
All notifications must be submitted simultaneously to two entities via a single mechanism:
ENISA is setting up a single reporting platform (Article 16) where manufacturers submit all notifications. This platform will route your notification to the appropriate national CSIRT automatically.
Article 16Submit to the CSIRT of the EU Member State where your company has its main establishment (where cybersecurity decisions are predominantly taken). The CSIRT receives and coordinates the response.
Article 14(7)No EU establishment? If your company has no EU headquarters, submit to the CSIRT of the Member State where your authorized representative, importer, or distributor with the most products is established (Article 14(7)).
EU National CSIRT Directory
| Country | CSIRT | Website |
|---|---|---|
| Austria | CERT.at | cert.at |
| Belgium | CERT.be | cert.be |
| Bulgaria | CERT Bulgaria | govcert.bg |
| Croatia | CERT.hr | www.cert.hr |
| Cyprus | CSIRT-CY | csirt.cy |
| Czech Republic | NUKIB CSIRT | nukib.cz |
| Denmark | CFCS CERT | cfcs.dk |
| Estonia | CERT-EE | www.cert.ee |
| Finland | NCSC-FI | www.kyberturvallisuuskeskus.fi |
| France | CERT-FR (ANSSI) | www.cert.ssi.gouv.fr |
| Germany | CERT-Bund (BSI) | www.bsi.bund.de |
| Greece | GR-CSIRT | csirt.cd.mil.gr |
| Hungary | NCSC-HU | nki.gov.hu |
| Ireland | CSIRT-IE | www.ncsc.gov.ie |
| Italy | CSIRT Italia | www.csirt.gov.it |
| Latvia | CERT.lv | cert.lv |
| Lithuania | CERT-LT | www.nksc.lt |
| Luxembourg | CIRCL | www.circl.lu |
| Malta | CSIRTMalta | csirtmalta.org |
| Netherlands | NCSC-NL | www.ncsc.nl |
| Poland | CERT Polska | cert.pl |
| Portugal | CERT.PT | www.cncs.gov.pt |
| Romania | CERT-RO | cert.ro |
| Slovakia | SK-CERT | www.sk-cert.sk |
| Slovenia | SI-CERT | www.cert.si |
| Spain | CCN-CERT / INCIBE-CERT | www.incibe.es |
| Sweden | CERT-SE | www.cert.se |
| EU (ENISA) | ENISA | www.enisa.europa.eu |
Source: ENISA CSIRTs Network. Contact details may change — verify with ENISA's official directory before submitting reports.
Don't Forget: Notify Your Users
After becoming aware of an actively exploited vulnerability or severe incident, you must also inform the impacted users of your product — and where appropriate, all users. Include any risk mitigation steps users can take. Use a structured, machine-readable format where appropriate.
Article 14(8)Readiness Checklist: 10 Items Before Sept 2026
Article 14 has applied since 11 September 2026. Make sure you have the following in place:
Related Tools
Submission and Activity Audit Log
No activity yet. Template downloads and timeline actions are recorded here with timestamps.